TTS Thru-Tubing Wash Down Gravel Pack
Features/Benefits
- Can be deployed on coil tubing in one trip. Does not require subsequent trips into the well to install pack-offs or tubing stops.
- Can accommodate production-tubing movement. Conventional thru-tubing wash down assemblies using pack-offs and tubing stops are subject to failure under conditions where production tubing movement is prevalent.
- Able to test sealing and anchoring components while installing. Unlike conventional thru-tubing wash down systems, sealing and anchoring component failures can be detected and repaired prior to producing the well.
- Available for tubing sizes from 2-3/8” – 5-1/2”.