thru tubing systems

Author: Thru-Tubing Systems Team

TTS 4-1/2″ Retrievable Bridge Plug stops high-rate downward flow

Posted on October 2, 2024

An operator in Vietnam faced a critical challenge when a tubing leak caused a down flow of 6,000 barrels per day (bpd) of water. To address this, the TTS Team evaluated the well parameters and recommended a targeted solution using a Paragon II Packer configuration. This innovative setup aimed to stop the water flow, allowing… Read more »


TTS Non-Explosive Electro-Hydraulic Bailer Bottom puts well back in production

Posted on August 16, 2024

Thru-Tubing Systems was contacted by a major deep-water operator in the Gulf of Mexico inquiring about a solution for dump-bailing glycol with non-explosive bailers to remedy a non-producing well. Using our Non-Explosive Electro-Hydraulic Bailer Bottom, we successfully made thirty-six bailer runs with a single tool without any misruns. In conjunction with a wireline company, TTS… Read more »


Join us at this year’s Wireline Industry Mixer

Posted on April 12, 2024

Join us at this year’s Wireline Industry Mixer in Houston, TX on May 7. Visit our booth for a chance to win a 4-night stay at The Wharf in Orange Beach, AL. Click here to learn more and register for event.


TTS Vented Umbrella Basket Remedies Years Long P&A Attempts

Posted on August 15, 2023

Thru-Tubing Systems was contacted after client had many failed P&A attempts over several years. A well that was drilled in 1992 and had liner leaking at 22,000’. While attempting to find the leak, the well had a blowout and fishing operations commenced to remove Champ packer at 19,226’.  While attempting to fish packer, the rig… Read more »


TTS Gas Lift Straddle Packer Helps Set New Record in Gulf of Mexico

Posted on August 15, 2023

Thru-Tubing systems was instrumental in the successful completion of a significant project for a deep-water well. This remarkable endeavor involved retrofitting a gas lift system, including the installation of a straddle packer assembly to isolate a thru-tubing gas lift valve. Setting a new record, this retrofit was executed at a remarkable depth of 19,800ft. The… Read more »


TTS Develops 2.5” High Expansion Packer

Posted on August 15, 2023

Thru-Tubing Systems instrumental in helping Helix Energy Solutions set a new deepest deployment record for the Helix 10K Intervention Riser System (IRS) on a deepwater well. The Q4000 performed a flow back on an unnamed well at a water depth of 2,851 meters. The Q4000 completed the flow back successfully, also performing a Thru-Tubing screen… Read more »


Translate